Case Stidies

Case Studies

Previous UNDER_ONE TWO THREE Next
Officer Secondary College

NEW

Working closely with the architect and builder, Britex was involved in Stage 2 of the

construction of Officer Secondary College providing over 75 linear metres of custom

measured and fabricated integral stainless steel benching...


Download the pdf to read more

CS officer secondary

Officer Secondary College

BOND LOUNGE, MELBOURNE

The recent 5 million dollar refurbishment of Bond Bar Melbourne followed a curvaceous theme

throughout, from the padded sweeping walls to the round leather stools and chairs, the award

winning interior of Melbourne's premier luxury venue needed a set of bars to match...


Download the pdf to read more

CS officer secondary

Officer Secondary College

OFFICER SECONDARY COLLEGE

Working closely with the architect and builder, Britex was involved in Stage 2 of the

construction of Officer Secondary College providing over 75 linear metres of custom

measured and fabricated integral stainless steel benching...


Download the pdf to read more

CS officer secondary

Hoa Nghiem Community Cultural Centre

HOA NGHIEM COMMUNITY & CULTURAL CENTRE

Britex was engaged by the building contractor to manufacture and install specially fabricated

stainless steel fixtures for the project. This process included generating shop drawings,

consultation in fixture design, manufacturing each fixture, project managing and coordinating

the production of fixtures with the primary contractor and installing the fixtures on site...


Download the pdf to read more
 CS hoa nghiem temple

Niddrie Village Public Toilet Block

NIDDRIE VILLAGE, PUBLIC TOILET BLOCK

Working closely with the Council we were able to use our expertise in public amenity fixtures

and knowledge of Australian Standards to provide a full fit out that not only completely adhered

to disability compliancies but was also fully vandal resistant...


Download the pdf to read more

CS niddrie toilet block

CSL Behring Australia

CSL BEHRING, AUSTRALIA

Given the nature of the site we worked closely with the architect and provided consultation

on fabrication design methods that met the strict guidelines required for this highly controlled

sterile environment..


Download the pdf to read more

CS csl behring

Previous UNDER_ONE TWO THREE Next